ASORTILAIN
Mon–Fri 09:00–18:00 Kyiv УКР

Platforms

Field notes for operations software

Practical guidance you can use with or without us. Each platform is a short, self-contained read.

PLATFORM1

Designing for no signal

Field apps fail in basements, lifts and rural roads. Rules we apply:

  • Write every action to a local queue first; the network is a delivery mechanism, not the source of truth.
  • Show sync status per item (queued, sent, confirmed), not a global spinner.
  • Give each action a client-generated ID so retries never duplicate a delivery.
  • Decide conflict rules in advance: last-write-wins is acceptable for notes, never for stock counts.
  • Test with airplane mode toggled mid-action, not only before.
PLATFORM2

Exception inventory template

Before estimating, list exceptions per task in a table with five columns: task, what goes wrong, how often (per shift), who resolves it, what proof is needed. Rows with high frequency and a photo or signature as proof are your first screens to design — they decide whether staff trust the tool.

PLATFORM3

Dispatch tables that work

  • Freeze the identifier column; dispatchers scan by order number.
  • Use tabular figures for times and quantities so columns align.
  • Colour encodes status only, always paired with a text label or icon.
  • Bulk actions need a visible count: “Assign 14 orders to route 7”.
  • Keyboard: J/K to move, Enter to open, Esc to close — and document it on screen.
PLATFORM4

Store review checklist

  • Organisation developer accounts registered to your legal entity, not an employee.
  • Privacy policy URL live and matching what the app collects.
  • Location permission: explain purpose in the prompt text; request background location only if essential and justified.
  • Demo account for reviewers if the app requires login.
  • Screenshots from the current build; no features that are not shipped.
  • Google Play: complete Data safety and target the current required API level.
PLATFORM5

Writing a brief we can estimate

A one-page brief is enough if it answers: who uses it (roles, count, devices); the three most frequent tasks; current tools; systems that must connect; constraints (deadline, budget range, hosting); how you will judge success in numbers. Use the dispatch planner to draft it.

PLATFORM6

Glossary

POD
Proof of delivery: signature, photo or code captured at handover.
WMS / TMS
Warehouse / transport management system.
Slotting
Assigning storage locations or delivery time windows.
Staged rollout
Releasing an update to a percentage of users first.